Sunday, November 15, 2009

I Pick the Worst Days !!

The start of the week was quit "balmy" in the mid 20's and with the air conditioner on it was quite pleasant in the "house".
The other side from the kitchen needed some squaring up and finishing off.
So the first piece of laminate was then "soudal"-ed in position with the appropriate cutout for the switch panel.





















The panel next to it was also fitted and cut out. The lower opening will have the "return air" grille for the air conditioner and the opening above will be a cupboard (use at this time not determined - but you can never have too much storage).





















That's it for the laminate except for the kitchen splash back which will be fitted over the sink/stove bench after that is installed.

So I decided to start on the "contra" for Sich while he organises the cupboards.

I'm doing some "wrought iron" work which is more in my line of metalwork but does require a lot of welding - so what happens - a string of 37deg. days with thunderstorms meaning 99% humidity. Just the thing while you're welding!!

So nothing much will happen for a week or so now while the cupboards are built elsewhere - but then (hopefully) dramatic advances!!

No comments: