Sunday, October 25, 2009

Slow Sat. / Sun. . .

Seems like both Sich and I were feeling a little worn down over the weekend so progress was slow but steady.
Access panel behind toilet was made and fitted prior to putting in toilet pedestal as there really isn't much room once everything is installed.
It only requires water to be connected (the little cutout in the access panel is for the hose to come through) and a last little bit of waste pipe to be obtained and fitted and it will be functional!!
It is a shame but you can only buy it in 1000mm lengths - and all I need is the 100mm from the end with the O-ring seal - I'll have to get that Monday.
A trim seal can then be fitted around the pipe as it goes through the floor to neaten that up and it'll be done.























The shower base still needs the last of the fibreglass release agent cleaned off but that is also ready to go - almost.
The kitchen sink waste will end up joining up with the shower waste so I am going to wait to see just where that ends up before I connect it as I ended up installing the toilet and water pump twice as getting pipes where you need them in the restricted space is not all that much fun!


















Lastly the fan and light electrical connections were installed and tried out.
The light is actually more yellow than pink but the camera white balance hasn't been adjusted for this photo - but you can see the temporary battery connections for the test.























Monday will see the shower head and tap unit installed and then I need to solve the hand basin situation - but it's getting closer . . .